Project Description

Name of the project: Stand-alone photovoltaic system for direct solar pumping on a property located in Torremocha de Jiloca

Placement: Torremocha de Jiloca, Teruel

Modality: Direct pumping

Date: October 2019

Installed Power: 5,18 kWp

Technology used: Photovoltaic system with polycrystalline modules, support structure with free height of 3.5 meters, inverter, monitoring system, MPPT regulator, impulse pump, speed variator, load regulator/MPPT regulator, irrigation programmer, radiation sensor