Project Description

Name of the project: LIFE REWIND Proyect – Demonstration installation in winery

Placement: Viñas del Vero, Barbastro, Huesca

Modality: Standalone self-consumption and grid-connected without surplus

Date: 2017

Technology used: Renewable generation system (photovoltaic on the ground (10,8 kWp), photovoltaic tracker (10,8 kWp) and floating photovoltaic (21,6 kWp)) to feed the electricity demand of a section of the winery, the WWTP (Wastewater Treatment Plant)

Project website: http://liferewind.unizar.es/?lang=en_GB