Project Description

Name of the project: Grid-connected photovoltaic self-consumption without storage at the Marqués de Lazan Hotel in Letux

Placement: Letux, Zaragoza

Modality: Grid-connected with surplus

Date: October 2019

Installed Power: 9.86 kWp

Technology used: Photovoltaic system with polycrystalline modules, inverters, monitoring system