Project Description

Name of the project: Implementation of a 500 kW photovoltaic solar plant connected to the grid without storage for El Rosado Distribution Centre

Placement: Guayaquil (Ecuador)

Modality: Grid-connected with surplus

Date: November 2019

Installed Power: 500 kWp

Energy produced: 750 MWh/year

t CO2 avoided/year: 262,5

Technology used: Photovoltaic system, coplanar structure to the roof, inverters, voltage transformer, monitoring system